ST6 Deployment Guide
Use this guide after the ST6 has been added to the MOCREO Smart App and confirmed online.
Use this guide after the ST6 has been added to the MOCREO Smart App and confirmed online.
ST6 DEPLOYMENT MAP
Mount, place, and verify
ST6

01 · MOUNT
Clean and dry the mounting surface, then attach the ST6 with the supplied Velcro fastener.
02 · PLACE
Choose a representative open-air location with good circulation and a reliable connection to the Hub.
03 · VERIFY
Confirm the ST6 remains online and that both temperature and humidity data continue to refresh.
Avoid: Direct sunlight, heaters, cooling outlets, fans, wet surfaces, and enclosed corners that trap heat or humidity.